Перегляд за автором "Karnaukhov, I.I."

Сортувати за: Порядок: Результатів:

  • Bezditko, A.P.; Gordienko, A.N.; Gladkikh, P.I.; Gvozd, A.M.; Kapliy, D.A.; Karnaukhov, I.M.; Karnaukhov, I.I.; Lyashchenko, V.N.; Mytsykov, A.O.; Moisieienko, M.P.; Rudenko, V.E.; Ryezayev, A.V.; Tarasov, D.V.; Trotsenko, V.I.; Zelinsky, A.Yu. (Вопросы атомной науки и техники, 2020)
    The NSC KIPT SCA Neutron Source uses 100 MeV/100 kW electron linear accelerator as a driver for the generation of the initial neutrons. The individual State tests of the accelerator were successfully carried out in July ...
  • Grevtsev, V.G.; Zelinsky, A.Yu.; Karnaukhov, I.I.; Mocheshnikov, N.I. (Вопросы атомной науки и техники, 2003)
    Conditions are considered for attaining a pressure of ~10⁻⁹ Torr in a vacuum chamber of the redesigned storage ring N100M with the use of both concentrated and distributed pumps. Estimates are made for admissible outgassing ...
  • Androsov, V.; Bezdetko, O.; Boriskin, V.; Gladkikh, P.; Gokov, S.; Gordienko, A.; Grevtsev, V.; Gvozd, A.; Ivashchenko, V.; Kalamayko, A.; Karnaukhov, I.I.; Karnaukhov, I.M.; Korzhov, D.; Kozin, V.; Kushnir, V.; Lyashchenko, V.; Moiseenko, M.; Margin, V.; Mocheshnikov, N.; Mytrochenko, V.; Mytsykov, A.; Peev, F.; Ryezayev, A.; Sergienko, V.; Shcherbakov, A.; Skirda, V.; Telegin, Y.; Trotsenko, V.; Zelinsky, A.; Zolochevskij, O.; Zvonarjova, O. (Вопросы атомной науки и техники, 2013)
    The first results of the NESTOR facility commissioning are presented. 60 MeV electron linac injector has been tested and the first electron beam with project parameters was registered at the screen monitors. Electron beam ...